One of the most frequently asked questions we get at Urbimed is: how long does it take to build a luxury villa from scratch? The answer depends on many factors, but in this article we give you a clear estimate based on our experience and an uncompromising approach to quality.
Before laying the first stone, it takes time to:
Define the architectural and technical design
Coordinate the drafting of the basic and execution project
Process building permits and municipal permits
This process can be accelerated if the client already has the land and is clear about his initial vision.
The construction time varies depending on:
The complexity of design
The total built area
The location and accessibility of the site
Climatology and logistics of materials
Generally speaking, a high-end detached villa can be built between 10 and 12 months. At Urbimed we prioritize quality and detail, so we avoid quick fixes that compromise the result.
After completing the structural work:
Interior and exterior finishes are finished
First occupancy licenses are managed
Each installation is checked and fine-tuned
Finally, we make a personalized delivery, accompanying the client in every corner of their new home.
In total, building a luxury villa can take between 15 and 18 months from the first meeting to the handover of the keys. At Urbimed, we accompany our clients at every stage, ensuring that every day of waiting is worth it. Because a well-made villa is not improvised: it is projected, built... and it is enjoyed for a lifetime.